ITAC Assessment: UF0035
ITAC logo
ITAC Assessment: UF0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product METAL FURNATURE
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $1
M
to 5
M
# of Employees 115
Plant Area
n/a
Annual Production 10,000
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,712 488,277
kWh
Natural Gas $12,446 3,708
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,910 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,839

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $208 $514 $208
2,638
kWh
02 2.7144: Install spectral reflectors / delamp $3,537 $6,210 $3,537
43,376
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $94 $1,630 $94
1,172
kWh
04 2.7233: Use properly designed and sized hvac equipment $136 $220 $136
1,758
kWh
05 2.4133: Use most efficient type of electric motors $448 $3,944 $448
5,569
kWh
06 2.6231: Utilize controls to operate equipment only when needed $6,487 $1,500 $6,487
79,719
kWh
TOTAL RECOMMENDED $10,910 $14,018 $10,910
134,232
kWh
TOTAL IMPLEMENTED $3,839 $8,354 $3,839
47,186
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs