ITAC Assessment: UF0032
ITAC logo
ITAC Assessment: UF0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product FURNATURE (SOFAS,TABLES)
NAICS
n/a
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area
n/a
Annual Production 15,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,920 824,150
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,876 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,258 $4,046 $5,258
57,151
kWh
02 2.7144: Install spectral reflectors / delamp $7,907 $29,400 $7,907
85,873
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,275 $6,980 $1,275
13,775
kWh
04 2.7233: Use properly designed and sized hvac equipment $474 $2,420 $474
5,275
kWh
05 2.4133: Use most efficient type of electric motors $137 $2,010 $137
1,465
kWh
06 2.4221: Install compressor air intakes in coolest locations $114 $100 $114
1,172
kWh
07 2.8114: Change rate schedules or other changes in utility service $1,711 $3,800 $1,711
-
kWh
TOTAL RECOMMENDED $16,876 $48,756 $16,876
164,711
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs