Assessment Year | 1992 |
---|---|
Principal Product | PRE-STRESSED CONCRETE |
NAICS |
n/a
|
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $50 M to 100M |
# of Employees | 55 |
Plant Area |
n/a
|
Annual Production | 59,000
ton
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $440,417 | 6,616,354 |
kWh
|
$0.067 |
LPG | $45,595 | 7,010 |
MMBtu
|
$6.50 |
Fuel Oil #2 | $4,912 | 755 |
MMBtu
|
$6.51 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $42,861 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,787 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $610 | $642 |
$610
9,672
kWh
|
- | |
02 | 2.7144: Install spectral reflectors / delamp | $4,143 | $4,000 |
$4,143
57,737
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $267 | $550 |
$267
4,103
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,380 | $4,766 |
$3,380
50,410
kWh
|
- | |
05 | 2.6232: Install set-back timers | $1,445 | $1,200 |
$1,445
21,688
kWh
|
- | |
06 | 2.7233: Use properly designed and sized hvac equipment | $1,567 | $2,820 |
$1,567
23,447
kWh
|
- | |
07 | 2.4133: Use most efficient type of electric motors | $10,518 | $49,969 |
$10,518
157,093
kWh
|
- | |
08 | 2.3191: Use demand controller or load shedder | $10,050 | - |
$10,050
-
kWh
|
- | |
09 | 2.2437: Recover waste heat from equipment | $10,881 | $17,195 | - |
$10,881
-
MMBtu
|
|
TOTAL RECOMMENDED | $42,861 | $81,142 |
$31,980
324,150
kWh
|
$10,881
-
MMBtu
|
||
TOTAL IMPLEMENTED | $17,787 | $59,947 |
$17,787
266,413
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs