ITAC Assessment: UF0027
ITAC logo
ITAC Assessment: UF0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PRE-STRESSED CONCRETE
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 55
Plant Area
n/a
Annual Production 59,000
ton
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $440,417 6,616,354
kWh
LPG $45,595 7,010
MMBtu
Fuel Oil #2 $4,912 755
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,861 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,787

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $610 $642 $610
9,672
kWh
-
02 2.7144: Install spectral reflectors / delamp $4,143 $4,000 $4,143
57,737
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $267 $550 $267
4,103
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,380 $4,766 $3,380
50,410
kWh
-
05 2.6232: Install set-back timers $1,445 $1,200 $1,445
21,688
kWh
-
06 2.7233: Use properly designed and sized hvac equipment $1,567 $2,820 $1,567
23,447
kWh
-
07 2.4133: Use most efficient type of electric motors $10,518 $49,969 $10,518
157,093
kWh
-
08 2.3191: Use demand controller or load shedder $10,050 - $10,050
-
kWh
-
09 2.2437: Recover waste heat from equipment $10,881 $17,195 - $10,881
-
MMBtu
TOTAL RECOMMENDED $42,861 $81,142 $31,980
324,150
kWh
$10,881
-
MMBtu
TOTAL IMPLEMENTED $17,787 $59,947 $17,787
266,413
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs