ITAC Assessment: MA0129
ITAC logo
ITAC Assessment: MA0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product EXPANDED POLYSTYRENE
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $1
M
to 5
M
# of Employees 80
Plant Area
n/a
Annual Production 1,000,000
pieces
Production Hrs. Annual 6,600
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,494 1,975,381
kWh
Fuel Oil #4 $114,204 36,490
MMBtu
Other Energy $228,022 21,225
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $156,050 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,768

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #4 Savings Other Energy Savings
01 2.1392: Replace purchased steam with other energy source $131,282 $58,725 - $(-96,740.0)
-
MMBtu
$228,022
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,039 $600 $4,039
38,101
kWh
- -
03 2.2437: Recover waste heat from equipment $6,380 $2,986 $(-461.0)
(-4,396)
kWh
- $6,841
-
MMBtu
04 2.6218: Turn off equipment when not in use $14,349 - - - $14,349
-
MMBtu
TOTAL RECOMMENDED $156,050 $62,311 $3,578
33,705
kWh
$(-96,740.0)
-
MMBtu
$249,212
-
MMBtu
TOTAL IMPLEMENTED $24,768 $3,586 $3,578
33,705
kWh
- $21,190
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs