ITAC Assessment: KU0234
ITAC logo
ITAC Assessment: KU0234
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product CORRUGATED CONTAINERS
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 35,000
ton
Production Hrs. Annual 6,048
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,878 2,559,496
kWh
Natural Gas $181,406 38,130
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,547 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,989

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,784 $3,862 $3,784
63,013
kWh
- -
02 2.2414: Use waste heat from hot flue gases to preheat $4,993 $8,000 - $4,993
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $5,345 $4,000 - $5,345
-
MMBtu
-
04 2.1222: Install turbulators $4,336 $6,311 - $4,336
-
MMBtu
-
05 2.4312: Improve lubrication practices $4,229 - $4,229
70,340
kWh
- -
06 2.2511: Insulate bare equipment $3,013 $5,000 - $3,013
-
MMBtu
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,044 - $2,044
33,998
kWh
- -
08 2.2135: Repair and eliminate steam leaks $1,504 $140 - $1,504
-
MMBtu
-
09 2.1233: Analyze flue gas for proper air/fuel ratio $1,385 - - $1,585
-
MMBtu
$(-200.0)
10 2.1311: Replace electrically-operated equipment with fossil fuel equipment $544 $400 $758
12,603
kWh
$(-214.0)
-
MMBtu
-
11 2.6218: Turn off equipment when not in use $370 - $370
6,155
kWh
- -
TOTAL RECOMMENDED $31,547 $27,713 $11,185
186,109
kWh
$20,562
-
MMBtu
$(-200.0)
TOTAL IMPLEMENTED $17,989 $13,402 $6,956
115,769
kWh
$11,233
-
MMBtu
$(-200.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs