Assessment Year | 1987 |
---|---|
Principal Product | CORRUGATED CONTAINERS |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 35,000
ton
|
Production Hrs. Annual | 6,048
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $153,878 | 2,559,496 |
kWh
|
$0.060 |
Natural Gas | $181,406 | 38,130 |
MMBtu
|
$4.76 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,547 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,989 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,784 | $3,862 |
$3,784
63,013
kWh
|
- | - | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $4,993 | $8,000 | - |
$4,993
-
MMBtu
|
- | |
03 | 2.2437: Recover waste heat from equipment | $5,345 | $4,000 | - |
$5,345
-
MMBtu
|
- | |
04 | 2.1222: Install turbulators | $4,336 | $6,311 | - |
$4,336
-
MMBtu
|
- | |
05 | 2.4312: Improve lubrication practices | $4,229 | - |
$4,229
70,340
kWh
|
- | - | |
06 | 2.2511: Insulate bare equipment | $3,013 | $5,000 | - |
$3,013
-
MMBtu
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,044 | - |
$2,044
33,998
kWh
|
- | - | |
08 | 2.2135: Repair and eliminate steam leaks | $1,504 | $140 | - |
$1,504
-
MMBtu
|
- | |
09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,385 | - | - |
$1,585
-
MMBtu
|
$(-200.0) | |
10 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $544 | $400 |
$758
12,603
kWh
|
$(-214.0)
-
MMBtu
|
- | |
11 | 2.6218: Turn off equipment when not in use | $370 | - |
$370
6,155
kWh
|
- | - | |
TOTAL RECOMMENDED | $31,547 | $27,713 |
$11,185
186,109
kWh
|
$20,562
-
MMBtu
|
$(-200.0) | ||
TOTAL IMPLEMENTED | $17,989 | $13,402 |
$6,956
115,769
kWh
|
$11,233
-
MMBtu
|
$(-200.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs