ITAC Assessment: UF0025
ITAC logo
ITAC Assessment: UF0025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product CARDIAC PACEMAKERS
NAICS
n/a
SIC 3845: Electromedical and Electrotherapeutic Apparatus
Sales Range $1
M
to 5
M
# of Employees 65
Plant Area
n/a
Annual Production 1,200
pieces
Production Hrs. Annual 2,275
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,905 759,965
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,103 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,276

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $553 $771 $553
7,034
kWh
02 2.7144: Install spectral reflectors / delamp $6,989 $8,775 $6,989
90,856
kWh
03 2.7111: Reduce illumination to minimum necessary levels $1,692 - $1,692
21,688
kWh
04 2.6232: Install set-back timers $577 $192 $577
7,620
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $376 $1,880 $376
4,982
kWh
06 2.7233: Use properly designed and sized hvac equipment $293 $3,450 $293
3,810
kWh
07 2.4133: Use most efficient type of electric motors $54 $825 $54
586
kWh
08 2.2447: Heat water with exhaust heat $569 $1,200 $569
7,327
kWh
TOTAL RECOMMENDED $11,103 $17,093 $11,103
143,903
kWh
TOTAL IMPLEMENTED $1,276 $6,926 $1,276
16,412
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs