ITAC Assessment: UF0002
ITAC logo
ITAC Assessment: UF0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product TRACK & ROTARY DRILLS
NAICS
n/a
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 140
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $173,248 2,118,406
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,282 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,282

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,788 $2,118 $2,788
33,998
kWh
02 2.7123: Keep lamps and reflectors clean $9,472 $3,600 $9,472
115,768
kWh
03 2.6232: Install set-back timers $3,111 $288 $3,111
38,101
kWh
04 2.7111: Reduce illumination to minimum necessary levels $2,464 - $2,464
30,188
kWh
05 2.4133: Use most efficient type of electric motors $251 $2,520 $251
2,931
kWh
06 2.7233: Use properly designed and sized hvac equipment $6,167 $5,300 $6,167
75,615
kWh
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $15,029 - $15,029
-
kWh
TOTAL RECOMMENDED $39,282 $13,826 $39,282
296,601
kWh
TOTAL IMPLEMENTED $39,282 $13,826 $39,282
296,601
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs