ITAC Assessment: UF0001
ITAC logo
ITAC Assessment: UF0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product DISPOSABLE MEDICAL HEMS
NAICS
n/a
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 3,300,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $156,214 2,257,913
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,535 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7123: Keep lamps and reflectors clean $3,198 - $3,198
45,721
kWh
02 2.6232: Install set-back timers $1,510 $528 $1,510
22,274
kWh
03 2.7233: Use properly designed and sized hvac equipment $459 - $459
6,741
kWh
04 2.4133: Use most efficient type of electric motors $113 $65 $113
1,758
kWh
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,105 - $4,105
-
kWh
06 2.7492: Use proper thickness of insulation on building envelope $11,150 $7,166 $11,150
163,247
kWh
TOTAL RECOMMENDED $20,535 $7,759 $20,535
239,741
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs