ITAC Assessment: UD1139
ITAC logo
ITAC Assessment: UD1139
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Custom Metal packaging and decorative metal products
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 250,000
ft2
Annual Production 5,164,886
units
Production Hrs. Annual 3,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $216,021 4,835,700
kWh
Electricity Demand $383,708 19,557
kW-mo/yr
Electricity Fees $7,200 -
Natural Gas $233,479 45,848
MMBtu
Waste Disposal Costs
Water Usage $7,617 356
Tgal
Water Disposal $5,978 356
Tgal
TOTAL YEARLY COSTS $854,003
RECOMMENDED SAVINGS* $74,013 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,028 $1,000 $3,344
74,799
kWh
$4,684
-
kW-mo/yr
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,391 - $1,829
40,914
kWh
$2,562
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $3,681 $4,800 $1,506
33,682
kWh
$2,175
-
kW-mo/yr
- - -
04 2.2443: Re-use or recycle hot or cold process exhaust air $38,983 $15,000 - - - $38,983
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $11,899 $20,626 $4,650
104,017
kWh
$6,513
-
kW-mo/yr
- - $736
06 2.3212: Optimize plant power factor $7,031 $18,291 - - $7,031 - -
TOTAL RECOMMENDED $74,013 $59,717 $11,329
253,412
kWh
$15,934
-
kW-mo/yr
$7,031 $38,983
-
MMBtu
$736
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs