ITAC Assessment: UD1110
ITAC logo
ITAC Assessment: UD1110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Automotive Parts
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 650
Plant Area 619,000
ft2
Annual Production 1,001
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $956,371 21,820,272
kWh
Electricity Demand $65,421 40,809
kW-mo/yr
Electricity Fees $34,618 -
Natural Gas $118,159 44,209
MMBtu
Waste Disposal Costs
Water Usage $81,918 15,275
Tgal
TOTAL YEARLY COSTS $1,256,487
RECOMMENDED SAVINGS* $74,481 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,358 - $5,940
135,614
kWh
$418
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,072 $1,464 $2,868
65,475
kWh
$204
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,927 $8,803 $2,553
58,285
kWh
$374
-
kW-mo/yr
- -
04 2.6212: Turn off equipment during breaks, reduce operating time $961 - $961
21,932
kWh
- - -
05 2.4239: Eliminate or reduce compressed air usage $11,733 $17,500 $11,733
267,874
kWh
- - -
06 2.4221: Install compressor air intakes in coolest locations $11,326 $4,060 $10,573
241,383
kWh
$753
-
kW-mo/yr
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,182 $953 $2,039
46,550
kWh
$143
-
kW-mo/yr
- -
08 2.2437: Recover waste heat from equipment $8,078 $19,900 $(-128.0)
(-2,919)
kWh
$(-9.0)
-
kW-mo/yr
- $8,215
-
MMBtu
09 2.3212: Optimize plant power factor $27,844 $76,225 - - $27,844 -
TOTAL RECOMMENDED $74,481 $128,905 $36,539
834,194
kWh
$1,883
-
kW-mo/yr
$27,844 $8,215
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs