ITAC Assessment: UD1088
ITAC logo
ITAC Assessment: UD1088
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Fixtures, casework, furniture, and componeents
NAICS 337212: Custom Architectural Woodwork and Millwork Manufacturing
SIC 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 100,000
ft2
Annual Production 1
units
Production Hrs. Annual 4,160
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,166 1,323,730
kWh
Electricity Demand $14,879 5,554
kW-mo/yr
Electricity Fees $234 -
Natural Gas $14,785 1,324
MMBtu
LPG $15,600 780
MMBtu
Waste Disposal Costs
Water Usage $1,137 138
Tgal
Water Disposal $1,218 138
Tgal
Other Liquid (non-haz) $339 1
gal
TOTAL YEARLY COSTS $185,358
RECOMMENDED SAVINGS* $24,292 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,165 $953 $2,015
19,448
kWh
$150
-
kW-mo/yr
- -
02 2.4239: Eliminate or reduce compressed air usage $1,698 $6,900 $1,698
16,388
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $1,590 $400 $1,412
13,630
kWh
$178
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,430 $48,200 $13,414
129,482
kWh
$1,001
-
kW-mo/yr
$3,015
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,017 - $942
9,091
kWh
$75
-
kW-mo/yr
- -
06 3.4116: Meter recycled water (to reduce sewer charges) $392 $1,225 - - - $392
-
Tgal
TOTAL RECOMMENDED $24,292 $57,678 $19,481
188,039
kWh
$1,404
-
kW-mo/yr
$3,015
-
MMBtu
$392
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs