ITAC Assessment: TS0012
ITAC logo
ITAC Assessment: TS0012
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product METAL PARTITIONS & FURNITURE
NAICS
n/a
SIC 2522: Office Furniture, Except Wood
Sales Range n/a
# of Employees 65
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,510 902,110
kWh
Natural Gas $36,323 7,985
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,222 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,857

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $952 $30 $952
9,086
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $365 $300 $365
3,517
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $13,907 - $13,907
132,767
kWh
-
04 2.7492: Use proper thickness of insulation on building envelope $2,998 $9,765 - $2,998
-
MMBtu
TOTAL RECOMMENDED $18,222 $10,095 $15,224
145,370
kWh
$2,998
-
MMBtu
TOTAL IMPLEMENTED $17,857 $9,795 $14,859
141,853
kWh
$2,998
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs