| Assessment Year | 2014 |
|---|---|
| Principal Product | Cast Iron Pipe |
| NAICS | 331511: Iron Foundries |
| SIC | 3321: Gray and Ductile Iron Foundries |
| Sales Range | $50 M to 100M |
| # of Employees | 150 |
| Plant Area |
153,500
ft2
|
| Annual Production | 60,000
ton
|
| Production Hrs. Annual | 2,523
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $485,274 | 15,084,000 |
kWh
|
$0.032 |
| Electricity Demand | $704,696 | 58,016 |
kW-mo/yr
|
$12.15 |
| Electricity Fees | $57,103 | - |
|
- |
| Natural Gas | $1,242,921 | 310,039 |
MMBtu
|
$4.01 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $87,295 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $44,655 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,090 | $47,700 |
$9,460
174,870
kWh
|
$10,630
-
kW-mo/yr
|
- | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $16,460 | $26 |
$6,320
116,810
kWh
|
$10,140
-
kW-mo/yr
|
- | - | |
| 03 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $14,200 | $600 | - | - | - |
$14,200
-
gal
|
|
| 04 | 2.4314: Use synthetic lubricant | $12,640 | - |
$5,950
110,100
kWh
|
$6,690
-
kW-mo/yr
|
- | - | |
| 05 | 2.7231: Use radiant heater for spot heating | $9,860 | $7,200 |
$(-2,450.0)
(-45,360)
kWh
|
$(-1,840.0)
-
kW-mo/yr
|
$14,150
-
MMBtu
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,015 | $2,000 |
$3,303
61,060
kWh
|
$3,712
-
kW-mo/yr
|
- | - | |
| 07 | 2.7123: Keep lamps and reflectors clean | $5,940 | $1,305 |
$5,940
109,720
kWh
|
- | - | - | |
| 08 | 2.7231: Use radiant heater for spot heating | $1,090 | $1,160 | - | - |
$1,090
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $87,295 | $59,991 |
$28,523
527,200
kWh
|
$29,332
-
kW-mo/yr
|
$15,240
-
MMBtu
|
$14,200
-
gal
|
||
| TOTAL IMPLEMENTED | $44,655 | $50,886 |
$19,083
352,740
kWh
|
$24,482
-
kW-mo/yr
|
$1,090
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs