ITAC Assessment: UD1087
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Industrial fans
NAICS 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $50
M
to 100
M
# of Employees 114
Plant Area 87,000
ft2
Annual Production 31,413
units
Production Hrs. Annual 2,168
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,617 1,173,709
kWh
Electricity Demand $35,930 5,157
kW-mo/yr
Electricity Fees $4,748 -
Natural Gas $9,911 6,421
MMBtu
Other Gas $2,574 1
MMBtu
Waste Disposal Costs
Water Usage $2,076 400
Tgal
Water Disposal $2,514 400
Tgal
TOTAL YEARLY COSTS $149,370
RECOMMENDED SAVINGS* $10,363 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $2,975 - $2,095
26,827
kWh
$880
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,335 $1,068 $894
11,441
kWh
$441
-
kW-mo/yr
- - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $684 - $458
5,876
kWh
$226
-
kW-mo/yr
- - - -
04 2.4221: Install compressor air intakes in coolest locations $452 $487 $319
4,081
kWh
$133
-
kW-mo/yr
- - - -
05 2.3212: Optimize plant power factor $3,614 $6,258 - $177
-
kW-mo/yr
$3,437 - - -
06 2.7135: Install occupancy sensors $399 $1,254 $358
4,590
kWh
- - - $34 $7
07 2.7111: Reduce illumination to minimum necessary levels $303 $900 $203
2,601
kWh
$100
-
kW-mo/yr
- - - -
08 2.7224: Reduce space conditioning during non-working hours $601 $2,093 - - - $601
-
MMBtu
- -
TOTAL RECOMMENDED $10,363 $12,060 $4,327
55,416
kWh
$1,957
-
kW-mo/yr
$3,437 $601
-
MMBtu
$34 $7
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs