| Assessment Year | 2024 |
|---|---|
| Principal Product | Hydraulic Pumps |
| NAICS | 333996: Fluid Power Pump and Motor Manufacturing |
| SIC | 3594: Fluid Power Pumps and Motors |
| Sales Range | $100 M to 500M |
| # of Employees | 65 |
| Plant Area |
155,322
ft2
|
| Annual Production | 4,709
units
|
| Production Hrs. Annual | 4,350
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $217,731 | 4,583,353 |
kWh
|
$0.048 | |
| Electricity Demand | $80,772 | 11,938 |
kW-mo/yr
|
$6.77 | |
| Electricity Fees | $7,847 | - |
|
- | |
| Natural Gas | $32,946 | 5,556 |
MMBtu
|
$5.93 | |
| Waste Disposal Costs | |||||
| Water Usage | $5,356 | 917 |
Tgal
|
$5.84 | |
| Water Disposal | $8,158 | 917 |
Tgal
|
$8.90 | |
| Other Liquid (non-haz) | $15,297 | 1 |
gal
|
$15,297.00 | |
| TOTAL YEARLY COSTS | $368,107 | ||||
| RECOMMENDED SAVINGS* | $70,647 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $1,134 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $12,814 | - |
$9,162
192,883
kWh
|
$3,652
-
kW-mo/yr
|
- | - | - | - | - | |
| 02 | 2.7124: Make a practice of turning off lights when not needed | $573 | - |
$411
8,654
kWh
|
- | - | - | - | $133 | $29 | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $54 | - |
$45
957
kWh
|
$9
-
kW-mo/yr
|
- | - | - | - | - | |
| 04 | 2.7233: Use properly designed and sized hvac equipment | $13,233 | - |
$14,371
302,541
kWh
|
$2,381
-
kW-mo/yr
|
- |
$(-3,519.0)
-
MMBtu
|
- | - | - | |
| 05 | 2.7224: Reduce space conditioning during non-working hours | $8,962 | $7,238 |
$2,917
61,403
kWh
|
- | - |
$6,045
-
MMBtu
|
- | - | - | |
| 06 | 2.6231: Utilize controls to operate equipment only when needed | $561 | - |
$561
11,817
kWh
|
- | - | - | - | - | - | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,965 | $1,068 |
$9,142
192,453
kWh
|
$1,823
-
kW-mo/yr
|
- | - | - | - | - | |
| 08 | 2.4239: Eliminate or reduce compressed air usage | $4,780 | - |
$4,780
100,640
kWh
|
- | - | - | - | - | - | |
| 09 | 2.4239: Eliminate or reduce compressed air usage | $4,459 | $7,620 |
$4,459
93,877
kWh
|
- | - | - | - | - | - | |
| 10 | 2.3212: Optimize plant power factor | $7,429 | $25,300 | - | - | $7,429 | - | - | - | - | |
| 11 | 3.4116: Meter recycled water (to reduce sewer charges) | $6,817 | - | - | - | - | - |
$6,817
-
Tgal
|
- | - | |
| TOTAL RECOMMENDED | $70,647 | $41,226 |
$45,848
965,225
kWh
|
$7,865
-
kW-mo/yr
|
$7,429 |
$2,526
-
MMBtu
|
$6,817
-
Tgal
|
$133 | $29 | ||
| TOTAL IMPLEMENTED | $1,134 | - |
$972
20,471
kWh
|
- | - | - | - | $133 | $29 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs