ITAC Assessment: UD1083
ITAC logo
ITAC Assessment: UD1083
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Friction Systems
NAICS 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 98
Plant Area 124,000
ft2
Annual Production 56,260,744
units
Production Hrs. Annual 3,744
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,568 2,101,525
kWh
Electricity Demand $38,341 7,379
kW-mo/yr
Electricity Fees $6,769 -
Natural Gas $12,717 1,326
MMBtu
Other Gas $2,321 1
MMBtu
Waste Disposal Costs
Water Usage $3,883 4,107
Tgal
Water Disposal $1,622 3,516
Tgal
Other Liquid (non-haz) $6,680 1
gal
TOTAL YEARLY COSTS $239,901
RECOMMENDED SAVINGS* $27,323 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings
01 2.6218: Turn off equipment when not in use $10,158 - $10,158
127,459
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,697 - $6,148
77,149
kWh
$549
-
kW-mo/yr
- -
03 2.7442: Keep doors and windows shut when not on use $2,183 - $2,183
27,387
kWh
- - -
04 2.7241: Install outside air damper / economizer on hvac unit $1,126 $720 $1,126
14,131
kWh
- - -
05 2.6218: Turn off equipment when not in use $3,294 - $3,294
41,329
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,148 $1,509 $1,148
14,401
kWh
- - -
07 2.6218: Turn off equipment when not in use $332 - $332
4,171
kWh
- - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $165 - $115
1,443
kWh
$50
-
kW-mo/yr
- -
09 2.7135: Install occupancy sensors $2,220 $1,846 $2,095
26,283
kWh
- $61 $64
TOTAL RECOMMENDED $27,323 $4,075 $26,599
333,753
kWh
$599
-
kW-mo/yr
$61 $64
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs