Assessment Year | 2023 |
---|---|
Principal Product | Air and Gas Compressors |
NAICS | 333912: Air and Gas Compressor Manufacturing |
SIC | 3563: Air and Gas Compressors |
Sales Range | $50 M to 100M |
# of Employees | 125 |
Plant Area |
250,000
ft2
|
Annual Production | 584
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $230,292 | 2,559,352 |
kWh
|
$0.090 | |
Electricity Demand | $63,498 | 12,551 |
kW-mo/yr
|
$5.06 | |
Electricity Fees | $7,183 | - |
|
- | |
Natural Gas | $85,183 | 17,259 |
MMBtu
|
$4.94 | |
Waste Disposal Costs | |||||
Water Usage | $20,549 | 3,130 |
Tgal
|
$6.57 | |
Water Disposal | $11,718 | 3,130 |
Tgal
|
$3.74 | |
Other Liquid (non-haz) | $7,825 | 1 |
gal
|
$7,825.00 | |
TOTAL YEARLY COSTS | $426,248 | ||||
RECOMMENDED SAVINGS* | $79,334 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $42,225 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $23,188 | - | - |
$23,188
-
kW-mo/yr
|
- | - | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $282 | - | - |
$282
-
kW-mo/yr
|
- | - | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $329 | - |
$299
3,325
kWh
|
$30
-
kW-mo/yr
|
- | - | - | |
04 | 2.4239: Eliminate or reduce compressed air usage | $10,990 | $11,117 |
$10,204
113,382
kWh
|
$786
-
kW-mo/yr
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,636 | $952 |
$7,090
78,772
kWh
|
$546
-
kW-mo/yr
|
- | - | - | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,653 | $1,115 | - | - |
$1,653
-
MMBtu
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $34,307 | $29,827 |
$19,340
215,040
kWh
|
$1,490
-
kW-mo/yr
|
- | $3,556 | $9,921 | |
08 | 2.7135: Install occupancy sensors | $949 | $290 |
$694
7,677
kWh
|
$159
-
kW-mo/yr
|
- | $19 | $77 | |
TOTAL RECOMMENDED | $79,334 | $43,301 |
$37,627
418,196
kWh
|
$26,481
-
kW-mo/yr
|
$1,653
-
MMBtu
|
$3,575 | $9,998 | ||
TOTAL IMPLEMENTED | $42,225 | $30,779 |
$26,430
293,812
kWh
|
$2,318
-
kW-mo/yr
|
- | $3,556 | $9,921 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs