Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Brake Hose Assemblies
NAICS 336340: Motor Vehicle Brake System Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 204
Plant Area 300,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $272,331 5,845,371
kWh
Electricity Demand $67,530 13,348
kW-mo/yr
Electricity Fees $10,361 -
Natural Gas $40,551 5,120
MMBtu
Waste Disposal Costs
Water Usage $18,461 2,647
Tgal
Water Disposal $21,051 2,647
Tgal
TOTAL YEARLY COSTS $430,285
RECOMMENDED SAVINGS* $44,866 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,950

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $9,795 $480 $8,527
182,979
kWh
$1,268
-
kW-mo/yr
- - - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $332 $1,200 $204
4,379
kWh
$128
-
kW-mo/yr
- - - -
03 2.7241: Install outside air damper / economizer on hvac unit $9,326 $2,880 $9,326
200,130
kWh
- - - - -
04 2.7444: Close holes and openings in building such as broken windows $133 $413 - - - $133
-
MMBtu
- -
05 2.4239: Eliminate or reduce compressed air usage $2,173 - $2,173
46,627
kWh
- - - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,974 $952 $1,514
32,500
kWh
$460
-
kW-mo/yr
- - - -
07 2.4239: Eliminate or reduce compressed air usage $767 $3,117 $767
16,459
kWh
- - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $4,676 $13,290 $2,231
47,873
kWh
$1,397
-
kW-mo/yr
- - $423 $625
09 2.2628: Utilize a less expensive cooling method $8,273 $24,175 $6,346
136,183
kWh
$1,927
-
kW-mo/yr
- - - -
10 2.3212: Optimize plant power factor $7,417 $31,038 - - $7,417 - - -
TOTAL RECOMMENDED $44,866 $77,545 $31,088
667,130
kWh
$5,180
-
kW-mo/yr
$7,417 $133
-
MMBtu
$423 $625
TOTAL IMPLEMENTED $18,950 $15,922 $14,649
314,358
kWh
$3,253
-
kW-mo/yr
- - $423 $625
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs