| Assessment Year | 2023 |
|---|---|
| Principal Product | Conductive Polymers |
| NAICS | 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing |
| SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 75 |
| Plant Area |
41,000
ft2
|
| Annual Production | 920,430
lb
|
| Production Hrs. Annual | 3,750
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $354,405 | 4,769,146 |
kWh
|
$0.074 | |
| Electricity Demand | $64,790 | 9,864 |
kW-mo/yr
|
$6.57 | |
| Electricity Fees | $1,407 | - |
|
- | |
| Natural Gas | $97,783 | 15,462 |
MMBtu
|
$6.32 | |
| Waste Disposal Costs | |||||
| Water Usage | $2,809 | 454 |
Tgal
|
$6.19 | |
| Water Disposal | $1,779 | 454 |
Tgal
|
$3.92 | |
| TOTAL YEARLY COSTS | $522,973 | ||||
| RECOMMENDED SAVINGS* | $120,986 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $103,774 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,474 | $250 |
$3,099
41,713
kWh
|
$375
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,573 | - |
$2,295
30,889
kWh
|
$278
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,193 | - |
$1,053
14,179
kWh
|
$140
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $36,442 | - |
$33,205
446,906
kWh
|
$612
-
kW-mo/yr
|
$2,625
-
MMBtu
|
- | - | |
| 05 | 2.4113: Install motor voltage controller on lightly loaded motors | $17,114 | $3,100 |
$15,265
205,457
kWh
|
$1,849
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,784 | - | - | - |
$3,784
-
MMBtu
|
- | - | |
| 07 | 2.2113: Repair or replace steam traps | $7,938 | $800 | - | - |
$7,938
-
MMBtu
|
- | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $23,824 | - |
$12,637
170,085
kWh
|
$3,576
-
kW-mo/yr
|
- | $2,918 | $4,693 | |
| 09 | 2.7135: Install occupancy sensors | $7,204 | $1,800 |
$7,136
96,048
kWh
|
- | - | - | $68 | |
| 10 | 2.7111: Reduce illumination to minimum necessary levels | $1,229 | - |
$655
8,813
kWh
|
$185
-
kW-mo/yr
|
- | $109 | $280 | |
| 11 | 2.7447: Install vinyl strip / high speed / air curtain doors | $228 | $368 | - | - |
$228
-
MMBtu
|
- | - | |
| 12 | 2.9114: Use solar heat to make electricty | $15,983 | $148,109 |
$13,990
188,293
kWh
|
$1,993
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $120,986 | $154,427 |
$89,335
1,202,383
kWh
|
$9,008
-
kW-mo/yr
|
$14,575
-
MMBtu
|
$3,027 | $5,041 | ||
| TOTAL IMPLEMENTED | $103,774 | $6,318 |
$74,690
1,005,277
kWh
|
$6,830
-
kW-mo/yr
|
$14,575
-
MMBtu
|
$2,918 | $4,761 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs