| Assessment Year | 2017 |
|---|---|
| Principal Product | Food packaging |
| NAICS | 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing |
| SIC | 3087: Custom Compounding of Purchased Plastics Resins |
| Sales Range | $10 M to 50M |
| # of Employees | 97 |
| Plant Area |
238,602
ft2
|
| Annual Production | 42,000,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,234,057 | 17,188,413 |
kWh
|
$0.072 |
| Natural Gas | $10,821 | 1,572 |
MMBtu
|
$6.88 |
| TOTAL YEARLY COSTS | $1,244,878 | |||
| RECOMMENDED SAVINGS* | $158,354 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $92,721 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $14,600 | - |
$14,600
203,100
kWh
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,179 | - |
$3,179
44,149
kWh
|
- | |
| 03 | 2.2625: Chill water to the highest temperature possible | $17,029 | $68 |
$17,029
236,520
kWh
|
- | |
| 04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $9,406 | $500 |
$9,406
130,637
kWh
|
- | |
| 05 | 2.2514: Cover open tanks | $29,884 | $2,350 |
$29,884
415,050
kWh
|
- | |
| 06 | 2.4239: Eliminate or reduce compressed air usage | $16,737 | $2,000 |
$16,737
232,465
kWh
|
- | |
| 07 | 2.4239: Eliminate or reduce compressed air usage | $7,640 | $1,600 |
$7,640
106,112
kWh
|
- | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $4,964 | $2,000 |
$4,964
68,950
kWh
|
- | |
| 09 | 2.4224: Upgrade controls on compressors | $1,684 | $1,500 |
$1,684
23,400
kWh
|
- | |
| 10 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $4,642 | $5,000 |
$4,642
64,469
kWh
|
- | |
| 11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $45,148 | $47,000 |
$44,056
611,883
kWh
|
$1,092 | |
| 12 | 2.7135: Install occupancy sensors | $3,441 | $1,931 |
$3,039
42,208
kWh
|
$402 | |
| TOTAL RECOMMENDED | $158,354 | $63,949 |
$156,860
2,178,943
kWh
|
$1,494 | ||
| TOTAL IMPLEMENTED | $92,721 | $52,099 |
$91,227
1,267,372
kWh
|
$1,494 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs