ITAC Assessment: MS0020
ITAC logo
ITAC Assessment: MS0020
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Office Furniture
NAICS
n/a
SIC 2522: Office Furniture, Except Wood
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 110,000
ft2
Annual Production 162,500
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,767 2,075,909
kWh
Natural Gas $12,335 2,797
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,050 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,592

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7132: Install timers on light switches in little used areas $8,151 $1,500 $8,151
148,300
kWh
-
02 2.6231: Utilize controls to operate equipment only when needed $6,400 $18,000 $6,400
116,354
kWh
-
03 2.7243: Improve air circulation with destratification fans / other methods $4,180 $8,000 - $4,180
-
MMBtu
04 2.7111: Reduce illumination to minimum necessary levels $1,412 - $1,412
22,567
kWh
-
05 2.6231: Utilize controls to operate equipment only when needed $687 $2,000 $465
8,499
kWh
$222
-
MMBtu
06 2.7135: Install occupancy sensors $220 $150 $220
4,103
kWh
-
TOTAL RECOMMENDED $21,050 $29,650 $16,648
299,823
kWh
$4,402
-
MMBtu
TOTAL IMPLEMENTED $5,592 $8,000 $1,412
22,567
kWh
$4,180
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs