| Assessment Year | 2009 |
|---|---|
| Principal Product | Electrical Connector |
| NAICS | 335931: Current-Carrying Wiring Device Manufacturing |
| SIC | 3643: Current-Carrying Wiring Devices |
| Sales Range | $10 M to 50M |
| # of Employees | 186 |
| Plant Area |
60,000
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $156,789 | 1,679,160 |
kWh
|
$0.093 |
| Electricity Demand | $64,825 | 4,112 |
kW-mo/yr
|
$15.76 |
| Electricity Fees | $4,122 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $84,307 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $316 | - |
$316
5,766
kWh
|
- | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,936 | $2,464 |
$3,002
31,016
kWh
|
$934
-
kW-mo/yr
|
|
| 03 | 2.4133: Use most efficient type of electric motors | $684 | $849 |
$684
7,064
kWh
|
- | |
| 04 | 2.2511: Insulate bare equipment | $942 | $2,473 |
$942
9,735
kWh
|
- | |
| 05 | 2.7141: Lower light fixtures in high ceiling areas | $972 | $2,956 |
$628
6,507
kWh
|
$344
-
kW-mo/yr
|
|
| 06 | 2.6218: Turn off equipment when not in use | $1,614 | $7,537 |
$1,614
16,681
kWh
|
- | |
| 07 | 2.7135: Install occupancy sensors | $1,231 | $10,326 |
$328
3,395
kWh
|
$903
-
kW-mo/yr
|
|
| 08 | 2.9114: Use solar heat to make electricty | $74,612 | $654,810 |
$37,245
384,800
kWh
|
$37,367
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $84,307 | $681,415 |
$44,759
464,964
kWh
|
$39,548
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs