ITAC Assessment: UD1050
ITAC logo
ITAC Assessment: UD1050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Vehicle Sensor and Control Devices
NAICS 334419: Other Electronic Component Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 200,000
ft2
Annual Production 38,000,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $831,479 13,903,500
kWh
Electricity Demand $277,465 25,970
kW-mo/yr
Electricity Fees $1,686 -
Natural Gas $90,126 9,386
MMBtu
Waste Disposal Costs
Water Usage $16,593 2,546
Tgal
Water Disposal $21,199 2,546
Tgal
TOTAL YEARLY COSTS $1,238,548
RECOMMENDED SAVINGS* $30,137 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,186

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,383 - $2,025
44,032
kWh
$358
-
kW-mo/yr
- - -
02 2.7262: Separate controls of air handlers from ac/ heating systems $3,723 - $3,164
68,781
kWh
$559
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,863 - $5,845
127,069
kWh
$1,018
-
kW-mo/yr
- - -
04 2.4239: Eliminate or reduce compressed air usage $3,060 - $3,060
66,516
kWh
- - - -
05 2.2442: Preheat combustion air with waste heat $4,168 - - - $4,168
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $9,940 $32,403 $4,691
102,000
kWh
$1,193
-
kW-mo/yr
- $3,500 $556
TOTAL RECOMMENDED $30,137 $32,403 $18,785
408,398
kWh
$3,128
-
kW-mo/yr
$4,168
-
MMBtu
$3,500 $556
TOTAL IMPLEMENTED $19,186 $32,403 $12,561
273,101
kWh
$2,569
-
kW-mo/yr
- $3,500 $556