| Assessment Year | 2023 |
|---|---|
| Principal Product | Vehicle Sensor and Control Devices |
| NAICS | 334419: Other Electronic Component Manufacturing |
| SIC | 3679: Electronic Components, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 500 |
| Plant Area |
200,000
ft2
|
| Annual Production | 38,000,000
units
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $831,479 | 13,903,500 |
kWh
|
$0.060 | |
| Electricity Demand | $277,465 | 25,970 |
kW-mo/yr
|
$10.68 | |
| Electricity Fees | $1,686 | - |
|
- | |
| Natural Gas | $90,126 | 9,386 |
MMBtu
|
$9.60 | |
| Waste Disposal Costs | |||||
| Water Usage | $16,593 | 2,546 |
Tgal
|
$6.52 | |
| Water Disposal | $21,199 | 2,546 |
Tgal
|
$8.33 | |
| TOTAL YEARLY COSTS | $1,238,548 | ||||
| RECOMMENDED SAVINGS* | $30,137 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $19,186 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,383 | - |
$2,025
44,032
kWh
|
$358
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.7262: Separate controls of air handlers from ac/ heating systems | $3,723 | - |
$3,164
68,781
kWh
|
$559
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,863 | - |
$5,845
127,069
kWh
|
$1,018
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $3,060 | - |
$3,060
66,516
kWh
|
- | - | - | - | |
| 05 | 2.2442: Preheat combustion air with waste heat | $4,168 | - | - | - |
$4,168
-
MMBtu
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,940 | $32,403 |
$4,691
102,000
kWh
|
$1,193
-
kW-mo/yr
|
- | $3,500 | $556 | |
| TOTAL RECOMMENDED | $30,137 | $32,403 |
$18,785
408,398
kWh
|
$3,128
-
kW-mo/yr
|
$4,168
-
MMBtu
|
$3,500 | $556 | ||
| TOTAL IMPLEMENTED | $19,186 | $32,403 |
$12,561
273,101
kWh
|
$2,569
-
kW-mo/yr
|
- | $3,500 | $556 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs