Assessment Year | 2022 |
---|---|
Principal Product | Car interiors |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 226 |
Plant Area |
320,500
ft2
|
Annual Production | 7,744,000
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $580,145 | 12,317,298 |
kWh
|
$0.047 | |
Electricity Demand | $582,192 | 29,112 |
kW-mo/yr
|
$20.00 | |
Natural Gas | $258,070 | 26,823 |
MMBtu
|
$9.62 | |
Waste Disposal Costs | |||||
Water Usage | $50,237 | 13,437 |
Tgal
|
$3.74 | |
Water Disposal | $20,300 | 13,437 |
Tgal
|
$1.51 | |
TOTAL YEARLY COSTS | $1,490,944 | ||||
RECOMMENDED SAVINGS* | $134,523 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.4116: Meter recycled water (to reduce sewer charges) | $12,355 | - | - | - | - |
$12,355
-
Tgal
|
- | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $10,327 | - |
$10,327
219,260
kWh
|
- | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,960 | $604 |
$7,134
151,474
kWh
|
$5,826
-
kW-mo/yr
|
- | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $3,702 | - |
$2,038
43,265
kWh
|
$1,664
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $69,148 | $18,523 |
$36,574
776,511
kWh
|
$29,818
-
kW-mo/yr
|
- | - | $2,756 | |
06 | 2.7314: Reduce ventilation air | $26,031 | $45,000 | - | - |
$26,031
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $134,523 | $64,127 |
$56,073
1,190,510
kWh
|
$37,308
-
kW-mo/yr
|
$26,031
-
MMBtu
|
$12,355
-
Tgal
|
$2,756 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs