ITAC Assessment: UD1014
ITAC logo
ITAC Assessment: UD1014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Milk, Cottage Cheese, Sour Cream, Yogurts, Beverages
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $100
M
to 500
M
# of Employees 145
Plant Area 120,000
ft2
Annual Production 217,049,025
lb
Production Hrs. Annual 8,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $565,239 12,560,865
kWh
Electricity Demand $99,219 26,388
kW-mo/yr
Electricity Fees $387,690 -
Natural Gas $247,589 56,000
MMBtu
Waste Disposal Costs
Water Usage $118,650 57,721
Tgal
Water Disposal $222,824 54,599
Tgal
TOTAL YEARLY COSTS $1,641,211
RECOMMENDED SAVINGS* $146,514 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,500

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,326 - - - $1,326
-
MMBtu
-
02 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $45,294 $7,500 $40,642
903,156
kWh
$4,652
-
kW-mo/yr
- -
03 2.2696: Use excess cold process fluid for industrial cooling needs $23,635 - $21,208
471,288
kWh
$2,427
-
kW-mo/yr
- -
04 2.2696: Use excess cold process fluid for industrial cooling needs $15,013 $21,000 $2,838
63,072
kWh
- $12,175
-
MMBtu
-
05 2.2511: Insulate bare equipment $28,500 $18,326 - - $28,500
-
MMBtu
-
06 2.2511: Insulate bare equipment $4,569 $309 $4,100
91,104
kWh
$469
-
kW-mo/yr
- -
07 2.2511: Insulate bare equipment $1,509 $2,357 - - $1,509
-
MMBtu
-
08 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $6,203 $7,500 $1,203
26,732
kWh
- - $5,000
09 2.4224: Upgrade controls on compressors $4,307 $10,000 $3,863
85,848
kWh
$444
-
kW-mo/yr
- -
10 2.4224: Upgrade controls on compressors $2,657 $1,120 $2,287
50,831
kWh
$370
-
kW-mo/yr
- -
11 2.4323: Use optimum size and capacity equipment $1,972 $5,000 $1,698
37,741
kWh
$274
-
kW-mo/yr
- -
12 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,907 $28,900 $6,917
153,702
kWh
$990
-
kW-mo/yr
- -
13 2.7135: Install occupancy sensors $3,028 $10,386 $1,336
29,690
kWh
$153
-
kW-mo/yr
- $1,539
14 2.7135: Install occupancy sensors $594 $1,213 $312
6,935
kWh
$36
-
kW-mo/yr
- $246
TOTAL RECOMMENDED $146,514 $113,611 $86,404
1,920,099
kWh
$9,815
-
kW-mo/yr
$43,510
-
MMBtu
$6,785
TOTAL IMPLEMENTED $28,500 $18,326 - - $28,500
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs