ITAC Assessment: UD1011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Circuits and Cables
NAICS 334412: Bare Printed Circuit Board Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 126
Plant Area 42,000
ft2
Annual Production 730,000
units
Production Hrs. Annual 3,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,667 750,288
kWh
Electricity Demand $10,540 2,880
kW-mo/yr
Electricity Fees $15,298 -
Natural Gas $10,079 1,436
MMBtu
Waste Disposal Costs
Water Usage $2,487 339
Tgal
Water Disposal $511 339
Tgal
TOTAL YEARLY COSTS $78,582
RECOMMENDED SAVINGS* $13,076 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,443

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $49 - $3
54
kWh
- $46
-
MMBtu
-
02 2.7241: Install outside air damper / economizer on hvac unit $2,143 $3,000 $2,143
40,540
kWh
- - -
03 2.2211: Use optimum temperature $881 - - - $881
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,486 $9,000 $5,147
97,360
kWh
$855
-
kW-mo/yr
- $484
05 2.4224: Upgrade controls on compressors $2,908 $45,000 $2,350
44,450
kWh
$558
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $609 $1,000 $567
10,727
kWh
$222
-
kW-mo/yr
- $(-180.0)
TOTAL RECOMMENDED $13,076 $58,000 $10,210
193,131
kWh
$1,635
-
kW-mo/yr
$927
-
MMBtu
$304
TOTAL IMPLEMENTED $9,443 $54,000 $7,500
141,864
kWh
$1,413
-
kW-mo/yr
$46
-
MMBtu
$484
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs