| Assessment Year | 2019 |
|---|---|
| Principal Product | Automotive Fasteners |
| NAICS | 332722: Bolt, Nut, Screw, Rivet, and Washer Manufacturing |
| SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
| Sales Range | $50 M to 100M |
| # of Employees | 90 |
| Plant Area |
200,000
ft2
|
| Annual Production | 250,000,000
units
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $256,328 | 3,110,400 |
kWh
|
$0.082 | |
| Electricity Demand | $24,771 | 10,985 |
kW-mo/yr
|
$2.25 | |
| Electricity Fees | $3,466 | - |
|
- | |
| Natural Gas | $7,126 | 842 |
MMBtu
|
$8.46 | |
| Waste Disposal Costs | |||||
| Water Usage | $7,141 | 417 |
Tgal
|
$17.14 | |
| TOTAL YEARLY COSTS | $298,832 | ||||
| RECOMMENDED SAVINGS* | $33,627 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $21,512 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,324 | - |
$3,072
37,273
kWh
|
$252
-
kW-mo/yr
|
- | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $17,300 | $4,100 |
$15,988
194,000
kWh
|
$1,312
-
kW-mo/yr
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $4,920 | - |
$4,547
55,170
kWh
|
$373
-
kW-mo/yr
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,211 | - |
$3,892
47,223
kWh
|
$319
-
kW-mo/yr
|
- | |
| 05 | 2.7135: Install occupancy sensors | $2,159 | $728 |
$1,371
16,640
kWh
|
$112
-
kW-mo/yr
|
$676 | |
| 06 | 2.7134: Use photocell controls | $1,712 | $3,540 |
$1,582
19,200
kWh
|
$130
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $33,627 | $8,368 |
$30,452
369,506
kWh
|
$2,499
-
kW-mo/yr
|
$676 | ||
| TOTAL IMPLEMENTED | $21,512 | $4,100 |
$19,880
241,223
kWh
|
$1,632
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs