| Assessment Year | 2019 |
|---|---|
| Principal Product | Screw Machine Products |
| NAICS | 332721: Precision Turned Product Manufacturing |
| SIC | 3451: Screw Machine Products |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
129,000
ft2
|
| Annual Production | 1,909,371
units
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $174,778 | 2,106,446 |
kWh
|
$0.083 | |
| Electricity Demand | $10,620 | 4,699 |
kW-mo/yr
|
$2.26 | |
| Electricity Fees | $2,426 | - |
|
- | |
| Natural Gas | $16,252 | 2,030 |
MMBtu
|
$8.01 | |
| Waste Disposal Costs | |||||
| Water Usage | $4,309 | 296 |
Tgal
|
$14.55 | |
| Water Disposal | $919 | 296 |
Tgal
|
$3.10 | |
| TOTAL YEARLY COSTS | $209,304 | ||||
| RECOMMENDED SAVINGS* | $42,699 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $30,721 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,369 | $4,400 |
$1,696
20,363
kWh
|
$3,673
-
kW-mo/yr
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,379 | $1,000 |
$3,684
44,223
kWh
|
$55
-
kW-mo/yr
|
$(-360.0) | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $881 | $1,500 |
$836
10,038
kWh
|
$45
-
kW-mo/yr
|
- | |
| 04 | 2.7241: Install outside air damper / economizer on hvac unit | $5,466 | $5,200 |
$5,466
65,643
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $21,973 | $39,240 |
$20,256
243,259
kWh
|
$1,097
-
kW-mo/yr
|
$620 | |
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $5,631 | - |
$5,342
64,152
kWh
|
$289
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $42,699 | $51,340 |
$37,280
447,678
kWh
|
$5,159
-
kW-mo/yr
|
$260 | ||
| TOTAL IMPLEMENTED | $30,721 | $44,640 |
$25,636
307,845
kWh
|
$4,825
-
kW-mo/yr
|
$260 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs