| Assessment Year | 2018 |
|---|---|
| Principal Product | Pumps |
| NAICS | 333911: Pump and Pumping Equipment Manufacturing |
| SIC | 3561: Pumps and Pumping Equipment |
| Sales Range | $50 M to 100M |
| # of Employees | 175 |
| Plant Area |
191,000
ft2
|
| Annual Production | 72,258
units
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $134,287 | 2,827,092 |
kWh
|
$0.048 | |
| Electricity Demand | $124,441 | 8,214 |
kW-mo/yr
|
$15.15 | |
| Electricity Fees | $780 | - |
|
- | |
| Natural Gas | $14,172 | 1,485 |
MMBtu
|
$9.54 | |
| Waste Disposal Costs | |||||
| Water Usage | $10,069 | 918 |
Tgal
|
$10.97 | |
| Water Disposal | $9,008 | 918 |
Tgal
|
$9.81 | |
| TOTAL YEARLY COSTS | $292,757 | ||||
| RECOMMENDED SAVINGS* | $51,006 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $49,748 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,113 | - |
$2,113
44,474
kWh
|
- | - | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,260 | $1,000 |
$1,989
43,641
kWh
|
$1,271
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4323: Use optimum size and capacity equipment | $957 | $2,500 |
$666
14,016
kWh
|
$291
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $938 | - |
$574
12,840
kWh
|
$364
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $320 | $1,500 |
$223
4,688
kWh
|
$97
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,998 | $55,816 |
$2,589
54,510
kWh
|
$3,964
-
kW-mo/yr
|
- | $6,445 | - | |
| 07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $30,420 | $25,000 | - | - |
$36,000
-
lb
|
$(-7,380.0) | $1,800 | |
| TOTAL RECOMMENDED | $51,006 | $85,816 |
$8,154
174,169
kWh
|
$5,987
-
kW-mo/yr
|
$36,000
-
lb
|
$(-935.0) | $1,800 | ||
| TOTAL IMPLEMENTED | $49,748 | $84,316 |
$7,357
156,641
kWh
|
$5,526
-
kW-mo/yr
|
$36,000
-
lb
|
$(-935.0) | $1,800 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | By-product Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs