ITAC Assessment: UD0965
ITAC logo
ITAC Assessment: UD0965
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Sandwiches
NAICS 311611: Animal (except Poultry) Slaughtering
SIC 2011: Meat Packing Plants
Sales Range $10
M
to 50
M
# of Employees 96
Plant Area 77,546
ft2
Annual Production 58,000,000
units
Production Hrs. Annual 8,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $367,118 4,400,724
kWh
Electricity Demand $26,979 8,592
kW-mo/yr
Electricity Fees $2,423 -
Natural Gas $61,997 11,408
MMBtu
Waste Disposal Costs
Water Usage $22,723 6,903
Tgal
Water Disposal $25,119 6,903
Tgal
TOTAL YEARLY COSTS $506,359
RECOMMENDED SAVINGS* $126,729 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $97,250

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $6,857 - $6,857
94,050
kWh
- - - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $303 - $280
3,840
kWh
$23
-
kW-mo/yr
- - - -
03 3.2172: Use automatic cleaning equipment $15,770 - $(-1,208.0)
(-16,575)
kWh
$(-294.0)
-
kW-mo/yr
$6,163
-
MMBtu
$11,109
-
Tgal
- -
04 3.4116: Meter recycled water (to reduce sewer charges) $6,437 $700 - - - - $6,437
-
Tgal
-
05 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $26,366 $2,000 $24,897
341,480
kWh
$1,469
-
kW-mo/yr
- - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,440 $80,000 $14,134
193,859
kWh
$306
-
kW-mo/yr
- - - -
07 2.2621: Modify refrigeration system to operate at a lower pressure $4,537 $10,000 $4,284
58,754
kWh
$253
-
kW-mo/yr
- - - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,342 $200 $3,156
43,283
kWh
$186
-
kW-mo/yr
- - - -
09 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation $5,101 - $3,099
42,505
kWh
$183
-
kW-mo/yr
$1,819
-
MMBtu
- - -
10 2.6212: Turn off equipment during breaks, reduce operating time $41,935 $20,000 $39,599
543,120
kWh
$2,336
-
kW-mo/yr
- - - -
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $560 $300 $560
7,677
kWh
- - - - -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $1,081 $1,230 $1,057
14,510
kWh
$56
-
kW-mo/yr
- - - $(-32.0)
TOTAL RECOMMENDED $126,729 $114,430 $96,715
1,326,503
kWh
$4,518
-
kW-mo/yr
$7,982
-
MMBtu
$11,109
-
Tgal
$6,437
-
Tgal
$(-32.0)
TOTAL IMPLEMENTED $97,250 $24,230 $68,004
932,717
kWh
$3,750
-
kW-mo/yr
$7,982
-
MMBtu
$11,109
-
Tgal
$6,437
-
Tgal
$(-32.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs