Assessment Year 2016
Principal Product All Other Plastics Product Manufacturing
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 206,800
ft2
Annual Production 14,000,000
lb
Production Hrs. Annual 6,048
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $459,142 6,253,387
kWh
Electricity Demand $105,387 14,292
kW-mo/yr
Electricity Fees $51,769 -
Natural Gas $41,728 5,637
MMBtu
Waste Disposal Costs
Water Usage $3,775 726
Tgal
Water Disposal $3,243 726
Tgal
TOTAL YEARLY COSTS $665,044
RECOMMENDED SAVINGS* $147,832 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $89,455 - - - $89,455 -
02 2.3212: Optimize plant power factor $15,347 $8,500 - - $15,347 -
03 2.2511: Insulate bare equipment $5,795 $690 $4,828
65,318
kWh
$967
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $9,787 $1,920 $9,244
125,077
kWh
- - $543
05 2.7142: Utilize higher efficiency lamps and/or ballasts $9,504 $1,152 $7,415
100,329
kWh
$1,485
-
kW-mo/yr
- $604
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,151 - $934
12,640
kWh
$206
-
kW-mo/yr
- $11
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,542 $1,000 $2,951
39,929
kWh
$591
-
kW-mo/yr
- -
08 2.4221: Install compressor air intakes in coolest locations $2,067 $1,500 $1,722
23,304
kWh
$345
-
kW-mo/yr
- -
09 2.4231: Reduce the pressure of compressed air to the minimum required $751 - $626
8,467
kWh
$125
-
kW-mo/yr
- -
10 2.4239: Eliminate or reduce compressed air usage $3,078 $6,000 $2,564
34,693
kWh
$514
-
kW-mo/yr
- -
11 2.4239: Eliminate or reduce compressed air usage $7,355 $21,500 $6,128
82,917
kWh
$1,227
-
kW-mo/yr
- -
TOTAL RECOMMENDED $147,832 $42,262 $36,412
492,674
kWh
$5,460
-
kW-mo/yr
$104,802 $1,158
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs