Assessment Year | 1985 |
---|---|
Principal Product | LATEX COMPOUNDS |
NAICS |
n/a
|
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 110 |
Plant Area |
n/a
|
Annual Production | 130,000,000
pieces
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $614,986 | 15,052,755 |
kWh
|
$0.041 |
Natural Gas | $932,261 | 198,984 |
MMBtu
|
$4.69 |
Fuel Oil #6 | $42,932 | 8,485 |
MMBtu
|
$5.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $75,949 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $74,006 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $4,573 | $2,500 | - |
$4,573
-
MMBtu
|
|
02 | 2.4133: Use most efficient type of electric motors | $18,450 | $2,602 |
$18,450
1,389,215
kWh
|
- | |
03 | 2.5194: Redesign process | $45,000 | $22,560 |
$10,800
263,775
kWh
|
$34,200
-
MMBtu
|
|
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,613 | $6,000 | - |
$1,613
-
MMBtu
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $1,943 | $75 |
$1,943
47,479
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,370 | $4,472 |
$4,370
106,975
kWh
|
- | |
TOTAL RECOMMENDED | $75,949 | $38,209 |
$35,563
1,807,444
kWh
|
$40,386
-
MMBtu
|
||
TOTAL IMPLEMENTED | $74,006 | $38,134 |
$33,620
1,759,965
kWh
|
$40,386
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs