| Assessment Year | 1985 |
|---|---|
| Principal Product | LATEX COMPOUNDS |
| NAICS |
n/a
|
| SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 110 |
| Plant Area |
n/a
|
| Annual Production | 130,000,000
pieces
|
| Production Hrs. Annual | 8,568
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $614,986 | 15,052,755 |
kWh
|
$0.041 |
| Natural Gas | $932,261 | 198,984 |
MMBtu
|
$4.69 |
| Fuel Oil #6 | $42,932 | 8,485 |
MMBtu
|
$5.06 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $75,949 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $74,006 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $4,573 | $2,500 | - |
$4,573
-
MMBtu
|
|
| 02 | 2.4133: Use most efficient type of electric motors | $18,450 | $2,602 |
$18,450
1,389,215
kWh
|
- | |
| 03 | 2.5194: Redesign process | $45,000 | $22,560 |
$10,800
263,775
kWh
|
$34,200
-
MMBtu
|
|
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,613 | $6,000 | - |
$1,613
-
MMBtu
|
|
| 05 | 2.4221: Install compressor air intakes in coolest locations | $1,943 | $75 |
$1,943
47,479
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,370 | $4,472 |
$4,370
106,975
kWh
|
- | |
| TOTAL RECOMMENDED | $75,949 | $38,209 |
$35,563
1,807,444
kWh
|
$40,386
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $74,006 | $38,134 |
$33,620
1,759,965
kWh
|
$40,386
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs