ITAC Assessment: GT0258
ITAC logo
ITAC Assessment: GT0258
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product LATEX COMPOUNDS
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 110
Plant Area
n/a
Annual Production 130,000,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $614,986 15,052,755
kWh
Natural Gas $932,261 198,984
MMBtu
Fuel Oil #6 $42,932 8,485
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,949 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $74,006

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $4,573 $2,500 - $4,573
-
MMBtu
02 2.4133: Use most efficient type of electric motors $18,450 $2,602 $18,450
1,389,215
kWh
-
03 2.5194: Redesign process $45,000 $22,560 $10,800
263,775
kWh
$34,200
-
MMBtu
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,613 $6,000 - $1,613
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $1,943 $75 $1,943
47,479
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,370 $4,472 $4,370
106,975
kWh
-
TOTAL RECOMMENDED $75,949 $38,209 $35,563
1,807,444
kWh
$40,386
-
MMBtu
TOTAL IMPLEMENTED $74,006 $38,134 $33,620
1,759,965
kWh
$40,386
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs