Assessment Year | 2016 |
---|---|
Principal Product | Bread, Cake, and Related Products & Cookies and Crackers |
NAICS | 311812: Commercial Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $100 M to 500M |
# of Employees | 550 |
Plant Area |
350,000
ft2
|
Annual Production | 147,471,785
units
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,339,567 | 18,477,200 |
kWh
|
$0.072 | |
Electricity Demand | $288,220 | 33,708 |
kW-mo/yr
|
$8.55 | |
Electricity Fees | $9,825 | - |
|
- | |
Natural Gas | $1,621,970 | 250,019 |
MMBtu
|
$6.49 | |
Waste Disposal Costs | |||||
Water Usage | $196,513 | 59,996 |
Tgal
|
$3.28 | |
Water Disposal | $792,604 | 59,996 |
Tgal
|
$13.21 | |
TOTAL YEARLY COSTS | $4,248,699 | ||||
RECOMMENDED SAVINGS* | $308,930 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (haz) Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1222: Install turbulators | $15,641 | $5,625 | - | - | - |
$15,641
-
MMBtu
|
- | - | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $14,421 | $14,000 | - | - | - |
$14,421
-
MMBtu
|
- | - | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $10,897 | $12,000 | - | - | - |
$10,897
-
MMBtu
|
- | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,229 | - | - | - | - |
$8,229
-
MMBtu
|
- | - | |
05 | 2.3212: Optimize plant power factor | $8,199 | $12,220 | - | - | $8,199 | - | - | - | |
06 | 2.4224: Upgrade controls on compressors | $26,938 | $30,000 |
$22,748
351,487
kWh
|
$4,190
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.4239: Eliminate or reduce compressed air usage | $8,566 | $24,600 |
$3,845
59,405
kWh
|
$4,721
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.2511: Insulate bare equipment | $1,966 | $3,394 | - | - | - |
$1,966
-
MMBtu
|
- | - | |
09 | 2.2621: Modify refrigeration system to operate at a lower pressure | $8,433 | $40,000 |
$797
12,308
kWh
|
$136
-
kW-mo/yr
|
- | - | - | $7,500 | |
10 | 2.2621: Modify refrigeration system to operate at a lower pressure | $6,204 | $10,000 |
$5,304
81,955
kWh
|
$900
-
kW-mo/yr
|
- | - | - | - | |
11 | 2.2621: Modify refrigeration system to operate at a lower pressure | $1,070 | $2,500 |
$1,070
16,528
kWh
|
- | - | - | - | - | |
12 | 3.3128: Utilize other methods to remove contaminants | $198,366 | $360,000 | - | - | - | - |
$198,366
-
lb
|
- | |
TOTAL RECOMMENDED | $308,930 | $514,339 |
$33,764
521,683
kWh
|
$9,947
-
kW-mo/yr
|
$8,199 |
$51,154
-
MMBtu
|
$198,366
-
lb
|
$7,500 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (haz) Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs