Assessment Year | 2016 |
---|---|
Principal Product | Garage Door Hardware |
NAICS | 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive) |
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 70 |
Plant Area |
200,000
ft2
|
Annual Production | 90,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $180,081 | 2,010,777 |
kWh
|
$0.090 | |
Electricity Demand | $21,341 | 5,772 |
kW-mo/yr
|
$3.70 | |
Electricity Fees | $1,830 | - |
|
- | |
Natural Gas | $34,191 | 4,436 |
MMBtu
|
$7.71 | |
Waste Disposal Costs | |||||
Water Usage | $800 | 256 |
Tgal
|
$3.13 | |
Water Disposal | $891 | 256 |
Tgal
|
$3.48 | |
TOTAL YEARLY COSTS | $239,134 | ||||
RECOMMENDED SAVINGS* | $14,212 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $6,531 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,653 | $42 |
$1,524
17,400
kWh
|
$129
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,397 | $1,000 |
$1,753
20,023
kWh
|
$148
-
kW-mo/yr
|
$(-504.0) | |
03 | 2.4224: Upgrade controls on compressors | $1,140 | $378 |
$1,051
12,000
kWh
|
$89
-
kW-mo/yr
|
- | |
04 | 2.4239: Eliminate or reduce compressed air usage | $297 | $468 |
$297
3,391
kWh
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,273 | - |
$4,680
53,453
kWh
|
$593
-
kW-mo/yr
|
- | |
06 | 2.4151: Develop a repair/replace policy | $1,258 | $3,250 |
$1,138
13,000
kWh
|
$120
-
kW-mo/yr
|
- | |
07 | 2.7135: Install occupancy sensors | $3,097 | $6,944 |
$2,871
32,789
kWh
|
- | $226 | |
08 | 2.6212: Turn off equipment during breaks, reduce operating time | $97 | $336 |
$84
955
kWh
|
$13
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $14,212 | $12,418 |
$13,398
153,011
kWh
|
$1,092
-
kW-mo/yr
|
$(-278.0) | ||
TOTAL IMPLEMENTED | $6,531 | $3,250 |
$5,818
66,453
kWh
|
$713
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs