ITAC Assessment: UD0950
ITAC logo
ITAC Assessment: UD0950
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Laminated Label Stock
NAICS 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 228,000
ft2
Annual Production 1,100,072,305
units
Production Hrs. Annual 6,120
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $181,235 2,646,378
kWh
Electricity Demand $29,707 6,012
kW-mo/yr
Electricity Fees $2,778 -
Natural Gas $80,171 12,969
MMBtu
TOTAL YEARLY COSTS $293,891
RECOMMENDED SAVINGS* $28,622 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,455

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.1116: Improve combustion control capability $5,935 $5,000 - - - $5,935
-
MMBtu
- -
02 2.2414: Use waste heat from hot flue gases to preheat $3,008 $10,000 - - - $3,008
-
MMBtu
- -
03 2.1222: Install turbulators $1,055 $1,875 - - - $1,055
-
MMBtu
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,050 $671 - - - $1,050
-
MMBtu
- -
05 2.2511: Insulate bare equipment $671 $1,116 - - - $671
-
MMBtu
- -
06 2.1241: Reduce excessive boiler blowdown $195 - - - - $195
-
MMBtu
- -
07 2.1123: Install automatic stack damper $424 $484 - - - $424
-
MMBtu
- -
08 2.7135: Install occupancy sensors $4,004 $1,452 $3,457
59,371
kWh
- - - $547 -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $2,530 $4,047 $2,284
39,234
kWh
$356
-
kW-mo/yr
- - $(-110.0) -
10 2.4151: Develop a repair/replace policy $240 $460 $158
2,710
kWh
$82
-
kW-mo/yr
- - - -
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $335 $1,000 $726
12,467
kWh
$113
-
kW-mo/yr
- - $(-504.0) -
12 2.3212: Optimize plant power factor $1,295 $6,540 - - $1,295 - - -
13 3.5316: Contract a wood pallet recycling company $7,880 - - - - - - $7,880
TOTAL RECOMMENDED $28,622 $32,645 $6,625
113,782
kWh
$551
-
kW-mo/yr
$1,295 $12,338
-
MMBtu
$(-67.0) $7,880
TOTAL IMPLEMENTED $8,455 $1,460 $884
15,177
kWh
$195
-
kW-mo/yr
- - $(-504.0) $7,880
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs