ITAC Assessment: NC0088
ITAC logo
ITAC Assessment: NC0088
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Synthetic Yarns
NAICS
n/a
SIC 2281: Yarn Spinning Mills
Sales Range $10
M
to 50
M
# of Employees 340
Plant Area 294,000
ft2
Annual Production 17,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $524,411 29,975,088
kWh
Electricity Demand $578,691 57,353
kW-mo/yr
Electricity Fees $5,977 -
Fuel Oil #6 $4,400 1,040
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,494 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,924

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,481 $4,901 $7,831
447,538
kWh
$7,650
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $305 $1,680 $103
5,862
kWh
$82
-
kW-mo/yr
- - $120
03 2.7135: Install occupancy sensors $1,297 $2,400 $298
17,585
kWh
$147
-
kW-mo/yr
- $852 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $565 $240 $280
16,120
kWh
$285
-
kW-mo/yr
- - -
05 2.2444: Use hot process fluids to preheat incoming process fluids $6,153 - $3,138
179,367
kWh
$3,015
-
kW-mo/yr
- - -
06 2.2711: Utilize outside air instead of conditioned air for drying $1,159 - $591
33,705
kWh
$568
-
kW-mo/yr
- - -
07 2.4133: Use most efficient type of electric motors $1,762 $1,717 $984
56,272
kWh
$778
-
kW-mo/yr
- - -
08 2.4131: Size electric motors for peak operating efficiency $5,334 $3,168 $2,720
136,870
kWh
$2,614
-
kW-mo/yr
- - -
09 3.5316: Contract a wood pallet recycling company $263 $100 - - $263
-
lb
- -
10 3.5315: Lease / purchase baler; sell cardboard to recycler $175 $100 - - $175
-
lb
- -
TOTAL RECOMMENDED $32,494 $14,306 $15,945
893,319
kWh
$15,139
-
kW-mo/yr
$438
-
lb
$852 $120
TOTAL IMPLEMENTED $7,924 $5,225 $3,984
209,262
kWh
$3,677
-
kW-mo/yr
$263
-
lb
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs