Assessment Year | 1996 |
---|---|
Principal Product | Synthetic Yarns |
NAICS |
n/a
|
SIC | 2281: Yarn Spinning Mills |
Sales Range | $10 M to 50M |
# of Employees | 340 |
Plant Area |
294,000
ft2
|
Annual Production | 17,000,000
lb
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $524,411 | 29,975,088 |
kWh
|
$0.017 |
Electricity Demand | $578,691 | 57,353 |
kW-mo/yr
|
$10.09 |
Electricity Fees | $5,977 | - |
|
- |
Fuel Oil #6 | $4,400 | 1,040 |
MMBtu
|
$4.23 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,494 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,924 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,481 | $4,901 |
$7,831
447,538
kWh
|
$7,650
-
kW-mo/yr
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $305 | $1,680 |
$103
5,862
kWh
|
$82
-
kW-mo/yr
|
- | - | $120 | |
03 | 2.7135: Install occupancy sensors | $1,297 | $2,400 |
$298
17,585
kWh
|
$147
-
kW-mo/yr
|
- | $852 | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $565 | $240 |
$280
16,120
kWh
|
$285
-
kW-mo/yr
|
- | - | - | |
05 | 2.2444: Use hot process fluids to preheat incoming process fluids | $6,153 | - |
$3,138
179,367
kWh
|
$3,015
-
kW-mo/yr
|
- | - | - | |
06 | 2.2711: Utilize outside air instead of conditioned air for drying | $1,159 | - |
$591
33,705
kWh
|
$568
-
kW-mo/yr
|
- | - | - | |
07 | 2.4133: Use most efficient type of electric motors | $1,762 | $1,717 |
$984
56,272
kWh
|
$778
-
kW-mo/yr
|
- | - | - | |
08 | 2.4131: Size electric motors for peak operating efficiency | $5,334 | $3,168 |
$2,720
136,870
kWh
|
$2,614
-
kW-mo/yr
|
- | - | - | |
09 | 3.5316: Contract a wood pallet recycling company | $263 | $100 | - | - |
$263
-
lb
|
- | - | |
10 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $175 | $100 | - | - |
$175
-
lb
|
- | - | |
TOTAL RECOMMENDED | $32,494 | $14,306 |
$15,945
893,319
kWh
|
$15,139
-
kW-mo/yr
|
$438
-
lb
|
$852 | $120 | ||
TOTAL IMPLEMENTED | $7,924 | $5,225 |
$3,984
209,262
kWh
|
$3,677
-
kW-mo/yr
|
$263
-
lb
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs