ITAC Assessment: HO0076
ITAC logo
ITAC Assessment: HO0076
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Soft Drinks
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 155,000
ft2
Annual Production 15,000,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $408,449 4,248,828
kWh
Fuel Oil #4 $121,412 27,050
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,496 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #4 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,741 $1,631 $1,741
18,171
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $760 $1,841 $760
7,913
kWh
-
03 2.4133: Use most efficient type of electric motors $2,847 $5,125 $2,847
29,601
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $2,270 $800 $2,270
23,740
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,299 $17,280 $4,299
44,842
kWh
-
06 2.2136: Install / repair insulation on steam lines $1,485 $600 - $1,485
-
MMBtu
07 2.2444: Use hot process fluids to preheat incoming process fluids $20,094 $20,000 - $20,094
-
MMBtu
TOTAL RECOMMENDED $33,496 $47,277 $11,917
124,267
kWh
$21,579
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #4 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs