Assessment Year | 2002 |
---|---|
Principal Product | Corrugated Boxes |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
200,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 5,904
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $357,424 | 3,832,953 |
kWh
|
$0.093 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $71,471 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $50,746 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.2135: Repair and eliminate steam leaks | $7,124 | - | - |
$7,124
-
MMBtu
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,874 | - |
$5,874
47,809
kWh
|
- | - | |
03 | 2.7135: Install occupancy sensors | $4,283 | $960 |
$4,283
32,413
kWh
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $1,539 | $1,024 |
$1,539
10,976
kWh
|
- | - | |
05 | 2.2511: Insulate bare equipment | $8,315 | $6,667 | - |
$8,315
-
MMBtu
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $11,732 | $16,065 | - |
$11,732
-
MMBtu
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $24,405 | $58,318 |
$24,405
186,990
kWh
|
- | - | |
08 | 2.4131: Size electric motors for peak operating efficiency | $210 | $627 |
$210
1,585
kWh
|
- | - | |
09 | 3.1191: Change procedures / equipment / operating conditions | $3,489 | - | - | - |
$3,489
-
lb
|
|
10 | 2.3212: Optimize plant power factor | $4,500 | $5,806 | - | - |
$4,500
-
lb
|
|
TOTAL RECOMMENDED | $71,471 | $89,467 |
$36,311
279,773
kWh
|
$27,171
-
MMBtu
|
$7,989
-
lb
|
||
TOTAL IMPLEMENTED | $50,746 | $66,009 |
$31,818
245,775
kWh
|
$15,439
-
MMBtu
|
$3,489
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs