ITAC Assessment: SF0237
ITAC logo
ITAC Assessment: SF0237
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Corrugated Boxes
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 200,000
ft2
Annual Production 0
units
Production Hrs. Annual 5,904
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $357,424 3,832,953
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,471 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,746

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.2135: Repair and eliminate steam leaks $7,124 - - $7,124
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,874 - $5,874
47,809
kWh
- -
03 2.7135: Install occupancy sensors $4,283 $960 $4,283
32,413
kWh
- -
04 2.4133: Use most efficient type of electric motors $1,539 $1,024 $1,539
10,976
kWh
- -
05 2.2511: Insulate bare equipment $8,315 $6,667 - $8,315
-
MMBtu
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $11,732 $16,065 - $11,732
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $24,405 $58,318 $24,405
186,990
kWh
- -
08 2.4131: Size electric motors for peak operating efficiency $210 $627 $210
1,585
kWh
- -
09 3.1191: Change procedures / equipment / operating conditions $3,489 - - - $3,489
-
lb
10 2.3212: Optimize plant power factor $4,500 $5,806 - - $4,500
-
lb
TOTAL RECOMMENDED $71,471 $89,467 $36,311
279,773
kWh
$27,171
-
MMBtu
$7,989
-
lb
TOTAL IMPLEMENTED $50,746 $66,009 $31,818
245,775
kWh
$15,439
-
MMBtu
$3,489
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs