ITAC Assessment: UD0946
ITAC logo
ITAC Assessment: UD0946
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Flat Rolled Slit Coil
NAICS 331221: Rolled Steel Shape Manufacturing
SIC 3316: Cold-Rolled Steel Sheet, Strip, and Bars
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 150,000
ft2
Annual Production 79,504
ton
Production Hrs. Annual 2,610
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,428 1,076,385
kWh
Electricity Demand $55,316 4,800
kW-mo/yr
Electricity Fees $781 -
Natural Gas $22,213 2,679
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,943 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,270

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7442: Keep doors and windows shut when not on use $5,504 $500 - - $5,504
-
MMBtu
02 2.7224: Reduce space conditioning during non-working hours $5,148 $1,660 - - $5,148
-
MMBtu
03 2.6212: Turn off equipment during breaks, reduce operating time $776 $400 $776
17,928
kWh
- -
04 2.3212: Optimize plant power factor $3,057 $2,000 - $3,057
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $304 - $143
3,309
kWh
$161
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,478 $77,725 $7,644
176,495
kWh
$9,834
-
kW-mo/yr
-
07 2.4151: Develop a repair/replace policy $462 $2,400 $217
5,016
kWh
$245
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $214 - $101
2,325
kWh
$113
-
kW-mo/yr
-
TOTAL RECOMMENDED $32,943 $84,685 $8,881
205,073
kWh
$13,410
-
kW-mo/yr
$10,652
-
MMBtu
TOTAL IMPLEMENTED $6,270 $2,900 $360
8,325
kWh
$406
-
kW-mo/yr
$5,504
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs