Assessment Year | 2016 |
---|---|
Principal Product | Rubber tiles, tread, and wall base |
NAICS | 326299: All Other Rubber Product Manufacturing |
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
275,000
ft2
|
Annual Production | 12,324
ton
|
Production Hrs. Annual | 6,528
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $604,948 | 7,964,660 |
kWh
|
$0.076 |
Electricity Demand | $179,680 | 24,708 |
kW-mo/yr
|
$7.27 |
Natural Gas | $712,648 | 132,796 |
MMBtu
|
$5.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $99,801 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,468 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.4116: Meter recycled water (to reduce sewer charges) | $32,216 | $700 | - | - | - |
$32,216
-
Tgal
|
- | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $26,548 | $2,400 | - | - |
$26,548
-
MMBtu
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,300 | - |
$1,300
16,560
kWh
|
- | - | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $620 | - |
$1,011
12,875
kWh
|
$209
-
kW-mo/yr
|
- | - | $(-600.0) | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $196 | $800 |
$196
2,492
kWh
|
- | - | - | - | - | |
06 | 2.3412: Use waste heat to produce steam to drive a steam turbine-generator | $24,866 | $81,180 |
$21,982
279,958
kWh
|
$2,884
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,294 | $4,525 |
$1,068
13,600
kWh
|
$226
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.4151: Develop a repair/replace policy | $411 | $2,031 |
$297
3,782
kWh
|
$114
-
kW-mo/yr
|
- | - | - | - | |
09 | 3.5316: Contract a wood pallet recycling company | $12,350 | - | - | - | - | - | - | $12,350 | |
TOTAL RECOMMENDED | $99,801 | $91,636 |
$25,854
329,267
kWh
|
$3,433
-
kW-mo/yr
|
$26,548
-
MMBtu
|
$32,216
-
Tgal
|
$(-600.0) | $12,350 | ||
TOTAL IMPLEMENTED | $28,468 | $2,400 |
$2,311
29,435
kWh
|
$209
-
kW-mo/yr
|
$26,548
-
MMBtu
|
- | $(-600.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs