Assessment Year | 1992 |
---|---|
Principal Product | ALUMINUM CASTINGS |
NAICS |
n/a
|
SIC | 3365: Aluminum Foundries |
Sales Range | $5 M to 10M |
# of Employees | 96 |
Plant Area |
n/a
|
Annual Production | 1,250,000
lb
|
Production Hrs. Annual | 4,125
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $218,255 | 1,857,562 |
kWh
|
$0.12 |
Natural Gas | $184,256 | 28,036 |
MMBtu
|
$6.57 |
Fuel Oil #2 | $27,117 | 4,970 |
MMBtu
|
$5.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,488 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,541 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $15,161 | $23,631 |
$(-482.0)
(-4,103)
kWh
|
$15,643
-
MMBtu
|
- | - | |
02 | 2.2437: Recover waste heat from equipment | $4,947 | $1,780 | - |
$4,947
-
MMBtu
|
- | - | |
03 | 2.2531: Re-size charging openings or add movable cover or door | $4,936 | $1,200 | - | - |
$4,936
-
MMBtu
|
- | |
04 | 2.2424: Use heat in flue gases to preheat products or materials | $335 | $990 | - |
$335
-
MMBtu
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $801 | $12 |
$895
7,620
kWh
|
- | - | $(-94.0) | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,619 | $1,500 |
$1,619
13,775
kWh
|
- | - | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $689 | - |
$689
5,862
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $28,488 | $29,113 |
$2,721
23,154
kWh
|
$20,925
-
MMBtu
|
$4,936
-
MMBtu
|
$(-94.0) | ||
TOTAL IMPLEMENTED | $23,541 | $27,333 |
$2,721
23,154
kWh
|
$15,978
-
MMBtu
|
$4,936
-
MMBtu
|
$(-94.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs