Assessment Year 1992
Principal Product ALUMINUM CASTINGS
NAICS
n/a
SIC 3365: Aluminum Foundries
Sales Range $5
M
to 10
M
# of Employees 96
Plant Area
n/a
Annual Production 1,250,000
lb
Production Hrs. Annual 4,125
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $218,255 1,857,562
kWh
Natural Gas $184,256 28,036
MMBtu
Fuel Oil #2 $27,117 4,970
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,488 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,541

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $15,161 $23,631 $(-482.0)
(-4,103)
kWh
$15,643
-
MMBtu
- -
02 2.2437: Recover waste heat from equipment $4,947 $1,780 - $4,947
-
MMBtu
- -
03 2.2531: Re-size charging openings or add movable cover or door $4,936 $1,200 - - $4,936
-
MMBtu
-
04 2.2424: Use heat in flue gases to preheat products or materials $335 $990 - $335
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $801 $12 $895
7,620
kWh
- - $(-94.0)
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,619 $1,500 $1,619
13,775
kWh
- - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $689 - $689
5,862
kWh
- - -
TOTAL RECOMMENDED $28,488 $29,113 $2,721
23,154
kWh
$20,925
-
MMBtu
$4,936
-
MMBtu
$(-94.0)
TOTAL IMPLEMENTED $23,541 $27,333 $2,721
23,154
kWh
$15,978
-
MMBtu
$4,936
-
MMBtu
$(-94.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs