Assessment Year | 2015 |
---|---|
Principal Product | Rocket motor tubes, ammunition liners and cartridges |
NAICS | 332994: Small Arms, Ordnance, and Ordnance Accessories Manufacturing |
SIC | 3489: Ordnance and Accessories, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
380,000
ft2
|
Annual Production | 4,004,000
pieces
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $270,144 | 4,714,728 |
kWh
|
$0.057 |
Electricity Demand | $182,664 | 13,008 |
kW-mo/yr
|
$14.04 |
Natural Gas | $179,481 | 34,205 |
MMBtu
|
$5.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $170,863 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $107,674 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $59,188 | - |
$6,764
167,009
kWh
|
$51,393
-
kW-mo/yr
|
- | - | $1,031 | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,352 | - |
$965
23,836
kWh
|
$2,387
-
kW-mo/yr
|
- | - | - | - | |
03 | 3.1227: Use counter-current rinsing to reduce rinse water volume (gravure) | $2,426 | $300 | - | - | - |
$819
-
Tgal
|
- |
$1,607
-
Tgal
|
|
04 | 3.4157: Replace water cooling on processes with air cooling | $34,411 | $5,100 |
$(-2,770.0)
(-68,400)
kWh
|
$(-381.0)
-
kW-mo/yr
|
- |
$12,679
-
Tgal
|
- |
$24,883
-
Tgal
|
|
05 | 2.7241: Install outside air damper / economizer on hvac unit | $43,664 | $10,000 |
$32,172
794,377
kWh
|
$11,492
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $13,067 | $17,500 |
$8,225
203,090
kWh
|
$4,842
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.4225: Install common header on compressors | $5,330 | $1,018 |
$3,047
75,240
kWh
|
$2,283
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.2514: Cover open tanks | $5,393 | $300 | - | - |
$5,280
-
MMBtu
|
$38
-
Tgal
|
- |
$75
-
Tgal
|
|
09 | 2.2414: Use waste heat from hot flue gases to preheat | $4,032 | $19,284 | - | - |
$4,032
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $170,863 | $53,502 |
$48,403
1,195,152
kWh
|
$72,016
-
kW-mo/yr
|
$9,312
-
MMBtu
|
$13,536
-
Tgal
|
$1,031 |
$26,565
-
Tgal
|
||
TOTAL IMPLEMENTED | $107,674 | $6,418 |
$8,006
197,685
kWh
|
$55,682
-
kW-mo/yr
|
$5,280
-
MMBtu
|
$12,717
-
Tgal
|
$1,031 |
$24,958
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs