Assessment Year | 2014 |
---|---|
Principal Product | Plastic and rubber automotive parts |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 432 |
Plant Area |
246,000
ft2
|
Annual Production | 23,400,000
lb
|
Production Hrs. Annual | 6,666
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,104,798 | 17,494,824 |
kWh
|
$0.063 |
Electricity Demand | $293,413 | 37,188 |
kW-mo/yr
|
$7.89 |
Natural Gas | $76,919 | 7,398 |
MMBtu
|
$10.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $214,859 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $62,657 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $34,542 | $8,700 |
$13,608
215,484
kWh
|
$20,934
-
kW-mo/yr
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,836 | $5,325 |
$5,581
88,378
kWh
|
$1,255
-
kW-mo/yr
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $436 | $400 |
$436
6,910
kWh
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,381 | - |
$4,638
73,441
kWh
|
$1,043
-
kW-mo/yr
|
$(-300.0) | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $3,264 | $5,000 |
$2,665
42,204
kWh
|
$599
-
kW-mo/yr
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,960 | $5,000 |
$1,600
25,331
kWh
|
$360
-
kW-mo/yr
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $57,276 | $82,980 |
$45,483
720,237
kWh
|
$10,230
-
kW-mo/yr
|
$1,563 | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $79,150 | $211,525 |
$64,617
1,023,231
kWh
|
$14,533
-
kW-mo/yr
|
- | - | |
09 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $3,388 | - |
$(-82.0)
(-1,300)
kWh
|
- | $(-250.0) | $3,720 | |
10 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $22,626 | - | - | - | - | $22,626 | |
TOTAL RECOMMENDED | $214,859 | $318,930 |
$138,546
2,193,916
kWh
|
$48,954
-
kW-mo/yr
|
$1,013 | $26,346 | ||
TOTAL IMPLEMENTED | $62,657 | $82,980 |
$50,121
793,678
kWh
|
$11,273
-
kW-mo/yr
|
$1,263 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs