ITAC Assessment: KU0399
ITAC logo
ITAC Assessment: KU0399
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Feedwater Heaters
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 60,000
ft2
Annual Production 40
pieces
Production Hrs. Annual 5,304
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,065 2,583,236
kWh
Natural Gas $42,314 10,864
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,691 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,080

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $2,080 $780 $2,080
43,669
kWh
-
02 2.4314: Use synthetic lubricant $1,675 - $1,675
35,170
kWh
-
03 2.7224: Reduce space conditioning during non-working hours $271 - $84
1,758
kWh
$187
-
MMBtu
04 2.7135: Install occupancy sensors $665 $1,900 $665
14,068
kWh
-
TOTAL RECOMMENDED $4,691 $2,680 $4,504
94,665
kWh
$187
-
MMBtu
TOTAL IMPLEMENTED $2,080 $780 $2,080
43,669
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs