ITAC Assessment: UD0905
ITAC logo
ITAC Assessment: UD0905
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product PV Modules
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $100
M
to 500
M
# of Employees 1,100
Plant Area 540,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 8,712
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,265,856 67,315,973
kWh
Electricity Demand $94,332 10,014
kW-mo/yr
Natural Gas $67,992 8,499
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,923 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,557

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.2623: Minimize condenser cooling water temperature $13,929 - $8,334
247,588
kWh
$5,595
-
kW-mo/yr
- -
02 2.2211: Use optimum temperature $5,296 - - - $5,296
-
MMBtu
-
03 2.4221: Install compressor air intakes in coolest locations $3,682 - $2,662
79,071
kWh
$1,020
-
kW-mo/yr
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,046 - $2,202
65,424
kWh
$844
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $50,533 $188,160 $33,667
1,000,182
kWh
$12,906
-
kW-mo/yr
- $3,960
06 2.4113: Install motor voltage controller on lightly loaded motors $437 $2,350 $316
9,385
kWh
$121
-
kW-mo/yr
- -
TOTAL RECOMMENDED $76,923 $190,510 $47,181
1,401,650
kWh
$20,486
-
kW-mo/yr
$5,296
-
MMBtu
$3,960
TOTAL IMPLEMENTED $62,557 $188,160 $38,531
1,144,677
kWh
$14,770
-
kW-mo/yr
$5,296
-
MMBtu
$3,960
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs