Assessment Year | 2014 |
---|---|
Principal Product | Blood and tissue |
NAICS | 621991: Blood and Organ Banks |
SIC | 8099: Health and Allied Services, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 261 |
Plant Area |
90,000
ft2
|
Annual Production | 244
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $300,942 | 4,687,347 |
kWh
|
$0.064 |
Electricity Demand | $58,751 | 8,856 |
kW-mo/yr
|
$6.63 |
Electricity Fees | $(-19,432.0) | - |
|
- |
Natural Gas | $55,170 | 7,066 |
MMBtu
|
$7.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $52,084 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,104 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $6,267 | - |
$5,475
86,135
kWh
|
$792
-
kW-mo/yr
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,433 | $1,000 |
$4,746
74,671
kWh
|
$687
-
kW-mo/yr
|
- | - | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $828 | - | - | - | - |
$828
-
MMBtu
|
|
04 | 2.7135: Install occupancy sensors | $671 | $6,000 |
$508
7,988
kWh
|
$163
-
kW-mo/yr
|
- | - | |
05 | 2.7241: Install outside air damper / economizer on hvac unit | $11,766 | - |
$1,486
23,378
kWh
|
$291
-
kW-mo/yr
|
- |
$9,989
-
MMBtu
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,717 | - |
$9,361
147,281
kWh
|
$1,356
-
kW-mo/yr
|
- | - | |
07 | 2.7224: Reduce space conditioning during non-working hours | $1,110 | - | - | - | - |
$1,110
-
MMBtu
|
|
08 | 2.8112: Combine utility meters | $5,096 | - | - | - | $5,096 | - | |
09 | 2.1331: Burn a less expensive grade of fuel | $9,848 | - |
$3,431
53,978
kWh
|
$8,096
-
kW-mo/yr
|
- |
$(-1,679.0)
-
MMBtu
|
|
10 | 2.2511: Insulate bare equipment | $348 | - |
$301
4,730
kWh
|
$47
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $52,084 | $7,000 |
$25,308
398,161
kWh
|
$11,432
-
kW-mo/yr
|
$5,096 |
$10,248
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,104 | $7,000 |
$5,254
82,659
kWh
|
$850
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs