ITAC Assessment: UD0902
ITAC logo
ITAC Assessment: UD0902
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Blood and tissue
NAICS 621991: Blood and Organ Banks
SIC 8099: Health and Allied Services, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 261
Plant Area 90,000
ft2
Annual Production 244
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $300,942 4,687,347
kWh
Electricity Demand $58,751 8,856
kW-mo/yr
Electricity Fees $(-19,432.0) -
Natural Gas $55,170 7,066
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,084 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,104

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4226: Use / purchase optimum sized compressor $6,267 - $5,475
86,135
kWh
$792
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,433 $1,000 $4,746
74,671
kWh
$687
-
kW-mo/yr
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $828 - - - - $828
-
MMBtu
04 2.7135: Install occupancy sensors $671 $6,000 $508
7,988
kWh
$163
-
kW-mo/yr
- -
05 2.7241: Install outside air damper / economizer on hvac unit $11,766 - $1,486
23,378
kWh
$291
-
kW-mo/yr
- $9,989
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,717 - $9,361
147,281
kWh
$1,356
-
kW-mo/yr
- -
07 2.7224: Reduce space conditioning during non-working hours $1,110 - - - - $1,110
-
MMBtu
08 2.8112: Combine utility meters $5,096 - - - $5,096 -
09 2.1331: Burn a less expensive grade of fuel $9,848 - $3,431
53,978
kWh
$8,096
-
kW-mo/yr
- $(-1,679.0)
-
MMBtu
10 2.2511: Insulate bare equipment $348 - $301
4,730
kWh
$47
-
kW-mo/yr
- -
TOTAL RECOMMENDED $52,084 $7,000 $25,308
398,161
kWh
$11,432
-
kW-mo/yr
$5,096 $10,248
-
MMBtu
TOTAL IMPLEMENTED $6,104 $7,000 $5,254
82,659
kWh
$850
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs