ITAC Assessment: CO0745
ITAC logo
ITAC Assessment: CO0745
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Treated wastewater and class B biosolids
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 3
Plant Area 30,000
ft2
Annual Production 767,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,705 2,179,000
kWh
Electricity Demand $106,760 6,003
kW-mo/yr
Electricity Fees $1,481 -
Natural Gas $39,947 5,405
MMBtu
Waste Disposal Costs
Water Usage $2,070 471
Tgal
Water Disposal $2,229 460
Tgal
Solid Waste (haz) $80,000 3,200,000
lb
TOTAL YEARLY COSTS $355,192
RECOMMENDED SAVINGS* $96,254 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $1,180 - - - - $1,180
02 2.4231: Reduce the pressure of compressed air to the minimum required $9,752 - $6,806
120,888
kWh
$2,946
-
kW-mo/yr
- -
03 2.2211: Use optimum temperature $10,067 - - - $10,067
-
MMBtu
-
04 2.9113: Use solar heat for heat $75,255 $445,900 - - - $75,255
TOTAL RECOMMENDED $96,254 $445,900 $6,806
120,888
kWh
$2,946
-
kW-mo/yr
$10,067
-
MMBtu
$76,435
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs