Assessment Year | 2012 |
---|---|
Principal Product | Automotive Transmission Components |
NAICS | 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $100 M to 500M |
# of Employees | 150 |
Plant Area |
100,000
ft2
|
Annual Production | 60,000,000
pieces
|
Production Hrs. Annual | 5,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $432,953 | 5,627,824 |
kWh
|
$0.077 |
Electricity Demand | $66,031 | 13,500 |
kW-mo/yr
|
$4.89 |
Natural Gas | $11,708 | 1,272 |
MMBtu
|
$9.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $58,053 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7124: Make a practice of turning off lights when not needed | $1,905 | - |
$1,905
24,473
kWh
|
- | - | |
02 | 2.7135: Install occupancy sensors | $597 | $950 |
$597
7,680
kWh
|
- | - | |
03 | 2.7124: Make a practice of turning off lights when not needed | $488 | - |
$425
5,346
kWh
|
$63
-
kW-mo/yr
|
- | |
04 | 2.6218: Turn off equipment when not in use | $27,260 | - |
$27,260
371,342
kWh
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,057 | - |
$5,222
71,129
kWh
|
$835
-
kW-mo/yr
|
- | |
06 | 2.6218: Turn off equipment when not in use | $3,649 | - |
$1,314
17,904
kWh
|
$2,335
-
kW-mo/yr
|
- | |
07 | 2.4151: Develop a repair/replace policy | $1,103 | $2,498 |
$951
12,954
kWh
|
$152
-
kW-mo/yr
|
- | |
08 | 2.4239: Eliminate or reduce compressed air usage | $5,075 | - |
$4,309
58,704
kWh
|
$766
-
kW-mo/yr
|
- | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,384 | $1,000 |
$3,516
47,898
kWh
|
$468
-
kW-mo/yr
|
$(-600.0) | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,963 | - |
$2,661
36,252
kWh
|
$302
-
kW-mo/yr
|
- | |
11 | 2.4239: Eliminate or reduce compressed air usage | $1,709 | $500 |
$1,495
20,375
kWh
|
$214
-
kW-mo/yr
|
- | |
12 | 2.2511: Insulate bare equipment | $1,754 | $5,700 |
$1,754
23,899
kWh
|
- | - | |
13 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,109 | - |
$2,109
28,739
kWh
|
- | - | |
TOTAL RECOMMENDED | $58,053 | $10,648 |
$53,518
726,695
kWh
|
$5,135
-
kW-mo/yr
|
$(-600.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs