Assessment Year | 2012 |
---|---|
Principal Product | Fiberglass Based Ceiling Tile |
NAICS | 327999: All Other Miscellaneous Nonmetallic Mineral Product Manufacturing |
SIC | 3299: Nonmetallic Mineral Products, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 130 |
Plant Area |
226,000
ft2
|
Annual Production | 80,000
thousand feet
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $236,741 | 4,911,000 |
kWh
|
$0.048 |
Electricity Demand | $64,912 | 13,140 |
kW-mo/yr
|
$4.94 |
Natural Gas | $141,588 | 30,148 |
MMBtu
|
$4.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $103,476 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,452 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $753 | $825 |
$656
9,504
kWh
|
- | - | $97 | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,891 | - |
$6,626
96,024
kWh
|
$1,265
-
kW-mo/yr
|
- | - | |
03 | 2.6241: Reduce temperature of process equipment when on standby | $4,665 | $2,000 |
$4,665
67,606
kWh
|
- | - | - | |
04 | 2.4226: Use / purchase optimum sized compressor | $12,400 | $57,000 |
$10,847
157,200
kWh
|
$1,553
-
kW-mo/yr
|
- | - | |
05 | 2.4224: Upgrade controls on compressors | $4,610 | $8,000 |
$4,610
66,809
kWh
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,808 | $1,000 |
$4,257
61,700
kWh
|
$551
-
kW-mo/yr
|
- | - | |
07 | 2.4239: Eliminate or reduce compressed air usage | $2,105 | $400 |
$1,841
26,672
kWh
|
$264
-
kW-mo/yr
|
- | - | |
08 | 2.2514: Cover open tanks | $1,504 | $1,000 | - | - |
$1,504
-
MMBtu
|
- | |
09 | 2.4131: Size electric motors for peak operating efficiency | $64,740 | $51,900 |
$56,657
818,144
kWh
|
$8,083
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $103,476 | $122,125 |
$90,159
1,303,659
kWh
|
$11,716
-
kW-mo/yr
|
$1,504
-
MMBtu
|
$97 | ||
TOTAL IMPLEMENTED | $13,452 | $1,825 |
$11,539
167,228
kWh
|
$1,816
-
kW-mo/yr
|
- | $97 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs