Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Infrared Cameras
NAICS 334220: Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing
SIC 3663: Radio and Television Broadcasting and Communications Equipment
Sales Range $100
M
to 500
M
# of Employees 550
Plant Area 243,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 3,672
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $791,758 15,963,603
kWh
Electricity Demand $383,503 32,196
kW-mo/yr
Natural Gas $237,070 41,347
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $243,998 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,166

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,307 $2,925 $3,413
75,169
kWh
$2,894
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,307 $2,925 $3,413
75,169
kWh
$2,894
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,365 $2,650 $1,280
28,188
kWh
$1,085
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,365 $2,650 $1,280
28,188
kWh
$1,085
-
kW-mo/yr
-
05 2.4224: Upgrade controls on compressors $5,184 - $5,184
114,176
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $888 $1,300 $655
14,420
kWh
$233
-
kW-mo/yr
-
07 2.6218: Turn off equipment when not in use $1,934 - $1,934
42,593
kWh
- -
08 2.7233: Use properly designed and sized hvac equipment $191,536 $383,074 $66,738
1,470,000
kWh
$23,721
-
kW-mo/yr
$101,077
-
MMBtu
09 2.2622: Replace existing chiller with high efficiency model $27,112 $122,500 $20,044
441,504
kWh
$7,068
-
kW-mo/yr
-
TOTAL RECOMMENDED $243,998 $518,024 $103,941
2,289,407
kWh
$38,980
-
kW-mo/yr
$101,077
-
MMBtu
TOTAL IMPLEMENTED $20,166 $12,450 $11,975
263,727
kWh
$8,191
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings